Government Subsidy Program
Project Overview
Goal
Implement profitable, private-led business models in real-world settings (residences, industrial complexes, commercial areas, etc.) and facilitate their nationwide adoption through regional hubs
Project Basis
Article 19 (1) (3) of the Smart Grid Construction and Utilization Promotion Act
Project Details
Efficient Smart Power Consumption
- Provide energy consulting services for large plants within the industrial complex and support its energy efficiency through the utilization of Demand Response (DR) and Factory Management System (FEMS)
- Provide building energy consulting services based on the Building Management System (BEMS) and reduce peak demand and energy based on the Cloud-BEMS
Efficient Smart Power Supply
- Achieve a self-sufficient smart city in connection with renewable energy sources such as fuel cells, biomass, and solar panel, etc.
- Establish a microgrid supply system that can achieve energy self-sufficiency through zone electricity and combined cogeneration power projects, etc.
AMI-based power service
- Support resale of electricity and provide power consumption consulting services in connection with projects related to efficient consumption of smart power and supply efficiency
- Provide various information such as the EMS-linked demand management and real-time power consumption and offer various additional services such as the DR project for energy-intensive businesses, etc.
Establishing an Integrated Management Center – Collect, analyze, and manage the operation of power consumption data generated from the devices and systems established through the expansion project
Project Performance
Infrastructure |
2016 |
2017 |
2018 |
Total |
AMI (number) |
74,318 |
41,302 |
32,124 |
147,744 |
EMS (place) |
196 |
227 |
141 |
564 |